Communication control IV

Increase number of construction drones controlled.\nThe more drones, the higher the building speed and energy consumption.
- Tier 4
- Data volume 180k hashes
- Requirements Communication control III
- Unlocks:
- +2 construction drone.
-
600x
Energy Matrix
-
600x
Structure Matrix