Vertical construction I

Increase vertical construction layers of storage, storage tank, and matrix lab to utilize space more effectively.

  • Stufe 1
  • Datenvolumen 36k hashes
  • Schaltet frei:
  • +2 layers lab vertical construction.
Kosten